CRITICAL PATH METALWORKS INC

DBA: CSM INDUSTRIAL CONSTRUCTORS

SILVER CLIFF, CO

C
Safety Grade
DOT Number
2287346
Status
AUTHORIZED
Fleet Size
1 units

CSA Safety Scores

FMCSA BASIC percentile scores. Higher percentile = more violations relative to peers. Carriers above the intervention threshold are flagged.

Unsafe DrivingN/A
Hours of ServiceN/A
Driver FitnessN/A
Controlled SubstancesN/A
Vehicle MaintenanceN/A
Hazmat ComplianceN/A
Crash IndicatorN/A

Crash History (24 Months)

0
Total Crashes
0
Fatal
0
Injury
0
Tow-Away

Inspection Results

Inspections Conducted

Vehicle Inspections0
Driver Inspections0
Hazmat Inspections0
Total0

Out-of-Service Rates

Vehicle OOSN/A
National avg: 20.7%
Driver OOSN/A
National avg: 5.5%
Hazmat OOSN/A
National avg: 4.5%

Grow your business in SILVER CLIFF

Get verified, receive leads, and stand out from competitors.

Claim This Profile

Company Details

Address
614 CLIFF STREET
SILVER CLIFF, CO 81252
Entity Type
PRIVATE PROPERTY
Drivers
2
Cargo Types
Building MaterialsConstruction

Insurance Status

BIPD RequiredMissing
Cargo RequiredMissing